Videos

For the latest videos please visit my YouTube channel: https://www.youtube.com/c/RochelleIntermodal 

25 October 2015
A video following in installation of the Tam Valley QuadLN decoder & servo switch machines on the single-slip leading to the yard

[youtube:https://www.youtube.com/watch?v=XTW7QUUCZxo]

06 August 2015
This is the latest overview of Rochelle Intermodal, showing the new yard & proposed loco facility and giving a short tour of the other areas of the layout.

[youtube:https://www.youtube.com/watch?v=3NYqpXu4iIc]

06 June 2015
First test of the new yard, testing the frog polarity and functioning of the SEEP powered turnouts.

[youtube:http://www.youtube.com/watch?v=Jd-LUJJ93Hg]

06 December 2014
Short layout tour: Testing a German locomotive for a fellow club member – good way to test the layout.

[youtube:http://www.youtube.com/watch?v=1MF4vN5aous]

22 November 2010
Two videos of Rochelle Intermodal at the White House Model Railway Group show in Hampton, Middlesex on 20th November 2010

[youtube:http://www.youtube.com/watch?v=kvlVk5E2gUc]

[youtube:http://www.youtube.com/watch?v=LypcKMLg7z0]

03 January 2008

The first video showing signalling on Rochelle Intermodal. I am just using one signal for now just to test the system. I am using the Digitrax SE8C Signal Controller in conjunction the BDL168 Block Detector, with signals controlled by JMRI’s Panel Pro. This video shows a loco entering a block with a green signal, then the signal changing to red when the loco has entered, and changing to green again when the loco has left the block

[youtube:http://www.youtube.com/watch?v=VI8cduaohC0]

This second video shows the JMRI Panel Pro screen as the loco enters block 1, showing the signal change to red (block 1 is at the bottom of the screen), then to green again as the loco leaves the block. The signal is the icon to the right on block 1.

[youtube:http://www.youtube.com/watch?v=KQT_-14R_Ho]

23 December 2007
The first complete circuit run of Rochelle Intermodal, excluding one board (which is almost finished). This first video shows the PanelPro screen, showing track 2 going active (track 2nd from bottom of screen, occupancy changes to red)

[youtube:http://www.youtube.com/watch?v=unSR-KoXkyI]

This video shows two trains running round the layout, shown from the computer end of the layout

[youtube:http://www.youtube.com/watch?v=QgBLV_BnArs]

This video shows two trains running round the layout, shown from the opposite end of the layout to the previous video

[youtube:http://www.youtube.com/watch?v=divV1aM0YYM]

19 September 2007
I built a test board to test the BDL168 block detector board, consisting of track with 3 sections. These video show a closeup of the lights on the BDL168 showing the progress of the loco along the track, as well as a loco moving along the track, with the lights on the BDL168 showing the progress.

[youtube:http://www.youtube.com/watch?v=NNfQo71TSoY]

This video shows a loco moving along the track, with the lights on the BDL168 showing the progress

[youtube:http://www.youtube.com/watch?v=UmuV0yUCexQ]