I’ve finally installed the last of my Tortoise motors on Intermodal module A. The last one involved a remote Tortoise mount…took longer than expected, and is more complicated than it looks! 40 steps on the instruction sheet…doesn’t seem like it would need so many steps, but there are a lot of little things to do that take a bit of time, most of it to do with alignment and wire bending…but at least I know how to do it now for next time!

Next to do is the installation of the Digitrax SE8C Signal Controller – that is a quick install – and the installation of the CML DAC10 turnout controller, including the connection of the Tortoise wiring.