New switching locations added
Peter Borcherds June 11th, 2017
I’ve just added a new switching location and moved an old one. I’ve extended the spur that previously served ‘Southeast Wood Treating’ and have added two new switches – one leads to the new location for Southeast Wood Treating, the other has created two new spurs for Nippon Sharyo, the railcar manufacturer. At the moment I have just pinned the track down and am hand-throwing the turnouts until I have worked out exactly what I am doing in this new section, but at least it adds two new spurs for operations.